OEE Calculator

Enter a shift's planned time, downtime, ideal rate and output. Get availability, performance, quality and OEE — no sensors required.

Time

Output

Where it stands

Availability88.5%
Performance84.7%
Quality96.9%

Markers show the components behind an 85% world-class OEE: 90% × 95% × 99%.

OEE

72.7%

Above typical for an SME line. The remaining gap is usually in performance — short stops no one logs.

Run time425 min
Actual rate101.6 / hr
Good units698
Ideal output in planned time960
Units lost to stops, speed and scrap262

How it's calculated

  1. 01Run time = planned production time − downtime.
  2. 02Availability = run time ÷ planned production time.
  3. 03Performance = (total units ÷ run time) ÷ ideal units per hour.
  4. 04Quality = good units ÷ total units.
  5. 05OEE = availability × performance × quality. 85% is the usual world-class reference; 40–60% is typical for an SME line that has never measured it.